Question
Building your SDLC Project Schedule for your Canadian IT SDLC Project Leverage from your WBS in Assignment 3 and build out your plan in excel
Building your SDLC Project Schedule for your Canadian IT SDLC Project Leverage from your WBS in Assignment 3 and build out your plan in excel or MPP and show some positive and negative variances from the baselined plan - 80% Explain the variances and how you will get back on track, if you can, and what you will do if you can't - 20%
project name is Johnson bridge Vancouver
Work Breakdown Structure
1. Project Initiation
1.1. Project Charter
1.2. Project Plan
1.3. Risk Analysis
2. Design
2.1. Structural Design
2.2. Architectural Design
2.3. Utility Design
3. Construction
3.1. Fabrication
3.2. Erection
3.3. Testing
4. Infrastructure
4.1. Road Construction
4.2. Utility Installation
4.3. Other Structures
5. Project Closeout
5.1. Final Inspection
5.2. Final Documentation
5.3. Project Review
6. Contingency
6.1. Weather Delays
6.2. Budget Overruns
6.3. Safety Issues
6.4. Other Issues
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started