Question
Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system with labor hours as the cost driver
Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system with labor hours as the cost driver but is considering switching to an activity-based costing system. In preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow:
Fabric Case Leather Case
Number of labor hours 15,00010,000
Number of material moves 551899
Number of setups 5684
Total estimated overhead costs are $223,250, of which $181,250 is assigned to the materials handling cost pool and $42,000 is assigned to the setup cost pool.
Required:
1.Calculate the overhead assigned to the leather case line using the traditional costing system based on direct labor hours.(Do not round intermediate calculations.)
I got 89,300 as the overhead assigned (This answer is correct)
2.Calculate the overhead assigned to the leather case line using ABC
????? I still need the overhead assigned for ABC ??????
3.Was the leather case over- or undercosted by the traditional cost system compared to ABC?
It was under-costed (This answer is correct)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started