C. Job: Installing an IT System at Bana Bank Zambia Ltd. (08-04- 2022 to 20-05- 2022) ACTIVITY WEEK NUMBER OF WORKDAYS A. Design system on
C. Job: Installing an IT System at Bana Bank Zambia Ltd. (08-04- 2022 to 20-05- 2022) ACTIVITY WEEK NUMBER OF WORKDAYS A. Design system on the computer 5 B. Purchase components 3 C. Configure network 2 D. Prepare software 2 E. Install software 4 F. Assemble computers 7 G. Connect computers H. Pilot test and refine system 2 I. Start up system, inaugurate and handover to client. From the data given above: a. Prepare/draw a full Gantt Chart as at end of Week 5. (10 Marks) b. Calculate and indicate the missing (?) week numbers. (10 Marks)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started