Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Cain components manufactures and distributes various plumbing products used in homes and other buildings. Over time. the production staff has noticed that products they considered
Cain components manufactures and distributes various plumbing products used in homes and other buildings. Over time. the production staff has noticed that products they considered easy to make were difficult to sell at margins considered reasonable, while products that seemed to take a lot of staff time were selling well despite recent price increases. A summer intern has suggested that the cost system might be providing misleading information. The controller decided that a good summer project for the intern would be to develop, in one self-contained area of the plant, an alternative cost system with which to compare the current system. The intern identified the following cost pools and, after discussion with some plant personnel, appropriate cost drivers for each pool. There were: Cost Pools Receiving Manufacturing Machine setup Shipping Costs $ 688,888 5,500,000 900, eee 1,88,888 Activity Drivers Direct material cost Machine-hours Production runs Units shipped In this particular area, Cain produces two of its many products: Standard and Deluxe. The following are data for production for the latest full year of operations. Total direct material costs Total direct labor costs Total machine-hours Total number of setups Total pounds of material Total direct labor-hours Number of units produced and shipped Products Standard Deluxe $220,000 $180,000 $650,000 $300,000 149, eee 11e, eee 100 100 15,5ee 11,5ee 6,25e 4,800 15, see 1e, eee The intern decides to look more closely at the manufacturing activity and determines that it can be broken down into two activities: production and engineering. Production covers the costs of ongoing manufacturing while engineering includes those activities dealing with engineering changes, design modifications, and so on. The costs attributed to production are $6.600.000 and the costs attributed to engineering are $4,100,000. After discussion with plant engineers, the intern decides that the best cost driver for engineering is setups, because most of the work arises from changes in the way the product is run. Required: 2-1. Compute the totals of the cost driver rates shown below. --2. What unit product costs will be reported for the two products if the revised ABC system is used? Complete this question by entering your answers in the tabs below. Reg A1 Reg A2 Compute the totals of the cost driver rates shown below. (Round intermediate calculations and "Manufacturing" answer to 2 decimal places.) % of material dollars per machine-hour Receiving Production Engineering Machine setup Shipping per setup per setup per unit Reg A1 Reg A2 What unit product costs will be reported for the two products if the revised ABC system is used? (Round "Unit 2 decimal places.) Deluxe Standard 870,000 $ $ 480,000 Direct Costs Overhead: $ 330,000 $ 270,000 Receiving Production Engineering Machine setup Shipping Total costs $ 1,200,000 $ 750,000 Number of units Unit cost 0 0
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started