Cain Components manufactures and distributes various plumbing products used in homes and other buildings. Over time, the production staff has noticed that products they considered easy to make were difficult to sell at margins considered reasonable, while products that seemed to take a lot of staff time were selling well despite recent price increases. A summer intern has suggested that the cost system might be providing misleading information The controller decided that a good summer project for the intern would be to develop, in one self-contained area of the plant, an alternative cost system with which to compare the current system. The intern identified the following cost pools and after discussion with some plant personnel, appropriate cost drivers for each pool. There were: Cost Pools Conta Activity Drivers Receiving $ 600,000 Direct material cost Manufacturing 5,500,000 Machine-hours Machine metup 900,000 Production runs Shipping 1,000,000 Units shipped In this particular area, Cain produces two of its many products: Standard and Deluxe. The following are data for production for the latest full year of operations, Total direct material conta Total direct labor coats Total machine-hours Total number of wetups Total pounds of material Total direct labor-hours Number of units produced and shipped Products Standard Deluxe $200,000 $200,000 $650,000 $340,000 132,000 118,000 120 80 13,500 13,500 6,450 4,200 11,000 14,000 The intern decides to look more closely at the manufacturing activity and determines that it can be broken down into two activities: production and engineering Production covers the costs of ongoing manufacturing while engineering includes those activities dealing with engineering changes, design modifications, and so on. The costs attributed to production are $6,783,000 and the costs attributed to engineering are $9,800,000. After discussion with plant engineers, the intern decides that the best cost driver for engineering is setups, because most of the work arises from changes in the way the product is run. S Reg A1 Req A2 Compute the totals of the cost driver rates shown below. (Round Intermediate calculations and Manufacturing a decimal places.) Receiving Production Engineering Machine setup Shipping % of material dollars per machine-hour per setup per setup per unit Rec AI Req A2 > Reg A1 Req AZ What unit product costs will be reported for the two products if the revised ABC syster is used? (Round "Unit cost" answer to 2 decimal places) Standard Deluxe Direct Costs Overhead Receiving Production Engineering Machine setup Shipping Total costs Number of units Unit cost