Calculate Lead Time 2 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7
Calculate Lead Time 2 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes. Traditional Philosophy Lean Manufacturing Philosophy \begin{tabular}{l} \hline Value-added time \\ Non-value-added time \\ Total lead time \\ Value-added ratio (as a percent) \end{tabular}