Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Calculate Lead Time Fint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes

image text in transcribed
Calculate Lead Time Fint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes milling and finishing. Parts are produced in batch sizes of 50 parts. A part requires 5 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 8 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged, however, the batch size is reduced to 6 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time 12 min min Non-value-added time min min Total lead time min min % Value-added ratio (as a percent)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Trap Doors And Trojan Horses An Auditing Action Adventure

Authors: D. Larry Crumbley, David Kerr, Veronica Paz, Lawrence Smith

1st Edition

1531021573, 978-1531021573

More Books

Students also viewed these Accounting questions