Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes

image text in transcribed
Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes miling and finishing Parts are produced in batch sizes of 90 parts. A part requires 5 minutes in miling and 10 minutes in finishing. The move time between the two operations for a complete batch is 11 minutes Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch yze is reduced to 4 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. It required, round percentages to one decimal place Traditional Philosophy Lean Manufacturing Philosophy X min Non-value-added time Total lead time Value-added ratio (as a percent) Value-added time min min min min min %

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting

Authors: Anne Britton, Chris Waterston

4th Edition

0273703609, 978-0273703600

More Books

Students also viewed these Accounting questions

Question

How is a standardized residual different from a residual?

Answered: 1 week ago

Question

What processes are involved in perceiving?

Answered: 1 week ago