Calculate Lead Time Orion Devices Inc. is considering a new just-in-time product cell. The present manufacturing approach produces a product in four separate steps. The
Calculate Lead Time
Orion Devices Inc. is considering a new just-in-time product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 58 units. The process time for each step is as follows: Process Step 1 7 minutes Process Step 2 5 minutes Process Step 3 4 minutes Process Step 4 9 minutes The time required to move each batch between steps is 10 minutes. In addition, the time to move raw materials to Process Step 1 is also 10 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 10 minutes. The new just-in-time layout will allow the company to reduce the batch sizes from 58 units to 3 units. The time required to move each batch between steps and the inventory locations will be reduced to 2 minutes. The processing time in each step will stay the same. Determine the value-added, non-value-added, total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place.
Present Approach | Proposed Approach | |||
Value-added time 25 | min 25 | min | ||
Non-value-added time | min | min | ||
Total lead time | min | min | ||
Value-added ratio (as a percent) | % | % |
PLEASE SHOW ALL WORK, WHERE NUMBERS COME FROM.
In this exercise for Present: Value-added processing time = Add together Process steps 1-4 Non-value-added time = Total within-batch wait time + Move time, where Total Within-Batch Wait Time = (Total Time to Perform Operations) x (Batch Size - 1). Add value-added processing time + non-value-added processing time to obtain total processing time. Calculate Value-Added Ratio = Value-Added Process Time Total Process Time In this exercise for Proposed: Value-added processing time = Add together Process steps 1-4 Non-value-added time = Total within-batch wait time + Move time, where Total Within-Batch Wait Time is obtained by multiplying the process time by the remaining units in the batch (waiting their turn) Add value-added processing time + non-value-added processing time to obtain total processing time. Calculate Value-Added Ratio = Value-Added Process Time Total Process Time
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started