Calculate Lead TimeFlint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling
CalculateLead TimeFlint Fabricators Inc. machines metal parts for the automotive
industry. Under the traditional manufacturing approach, the parts
are machined through two processes: milling and finishing. Parts
are produced in batch sizes of parts. A part requires minutes
in milling and minutes in finishing. The move time between the
two operations for a complete batch is minutes.Under the lean philosophy, the part is produced in a cell that
includes both the milling and finishing operations. The operating
time is unchanged; however, the batch size is reduced to parts
and the move time is eliminated.Determine thevalueadded,nonvalueadded, and total
lead times, and thevalueadded ratiounder the
traditional and lean manufacturing methods. If required, round
percentages to one decimal place.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started