Calculate the replacement cost for a Class A central city office building: Including the ground floor, there are 30 floors above grade, and each is

Calculate the replacement cost for a Class A central city office building: Including the ground floor, there are 30 floors above grade, and each is 105 by 200. The direct cost of construction is $310.00/SF (square foot), but this must be adjusted upward by 15% as a local cost multiplier.

There are 3 stories of underground parking, at 21,000 SF each. The direct cost of construction for the parking garage is $72.00/SF, but this must be adjusted upward by 15% as a local cost multiplier.

Add 12% to account for indirect costs. Add 20% to the total direct + indirect costs to account for entrepreneurial incentive.

1A. What are the total direct costs of construction?

1B. What are the total indirect costs?

1C. How much is allocated for entrepreneurial incentive?

1D. What is the total replacement cost, including direct, indirect, and entrepreneurial incentive?

1E. Site acquisition were as follows: 25,000 SF of site area times $350/SF. What is the total cost of the project including land?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions