Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Calculate the tail, lead and total slurry volume, displacement volume, water and additive requirements for a 13 3/8 casing using the following data: Subsca

image text in transcribed

Calculate the tail, lead and total slurry volume, displacement volume, water and additive requirements for a 13 3/8" casing using the following data: Subsca well with seabed at 450 ft below Rotary Table, 16" hole, TD is at 6000 ft 13 3/8" shoc at 5980 ft, N-80, 72 lb/ft, ID = 12.347 in 20" shoc at 2000 ft, K55, 133 lb/ft, ID = 19.73 in TOC to be 500 ft inside 20" casing shoe Tail slurry to extend 500 ft above the 13 3/8" shoe The shoe track consists of 1 joint. 5" drill pipe, 19.5 lb/ft is used as the running string You are required to base cement volumes on open hole volume plus 30% excess. Lead Slurry: Class G cement +0.3 gals/sk extender + 0.2 gals/sk retarder + 11.35 gals/sk seawater, Yield -1.99 ft/sk, Density - 13.0 ppg Tail slurry: Class G cement + 0.05 gals/sk retarder +0.05 gals/sk dispersant +4.8gals/sk freshwater, Yield-1.13 ft/sk. Density = 16.00 ppg

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Vector Mechanics For Engineers Statics

Authors: R.C.Hibbeler

7th Edition

978-0072931105, 0072931108

More Books

Students also viewed these Mechanical Engineering questions

Question

Solve. Give exact solutions. x 2 = 10 + 3x

Answered: 1 week ago