Calculate the WACC (CPPC), for the evaluation of a project with the following information: Own contribution 57.14% Debt 42.86% Tmar Cp 18.50% T (Tax Rta)
Calculate the WACC (CPPC), for the evaluation of a project with the following information:
Own contribution 57.14%
Debt 42.86%
Tmar
Cp 18.50%
T (Tax Rta) 22.00%
inflation: 1.25%
Risk premium: 16%
Select one: a. None of the above b. 21.20% c. 21.38% d. 21.33% e. 21.32%