If a steel fabricator has taken a job numbered 100, that consists of producing 500 steel supports for another company. Overhead is applied on the basis of direct labor hours, using a predetermined overhead rate of $35 per hour. Direct costs associated with Job 100 are: direct materials, $20,000; direct labor, 250 hours at $20 per hour.
Calculate the cost of job 100.