Answered step by step
Verified Expert Solution
Link Copied!

Question

...
1 Approved Answer

Calculator Panamint Systems Corporation is estimating activity costs associated with producing dok drives tapes drivers and wiredrives. The indirect labor can be traced to four

image text in transcribed
image text in transcribed
image text in transcribed
Calculator Panamint Systems Corporation is estimating activity costs associated with producing dok drives tapes drivers and wiredrives. The indirect labor can be traced to four separate activity Doors The budgeted activity cost and activity base data by product are provided below. Activity Cost Activity Base Procurement 1306.000 Number of purchase orders Scheduling 220,700 Number of production orders 426,000 Number of moves Product development 744,300 Number of engineering anges Production 1,400,000 Machine hours Number of Number of Number of Number Number of Purchase Production of Engineering Machine Orders Orders Moves Changes Hours Dok drives 450 13 1,500 Tapedes 2,200 1 3,400 Wiredrive 11.500 760 3,000 11.500 The activity for the reactivity op 1.00 3,600 2,100 Previous mas Som A Gradinis 12:20 PM 11/20 Prison Home 18 End PyUp Pgon 10 3 73 F 19 342 A $ 4 % 5 & 7 3 6 8 9 0 R T Y U O I F G H J K L V B N M ? 1 Aleutian Company produces two products: Rings and Dings. They are madactured in two departments Fabrication and Assembly, Data for the products and departments are listed below Number of Direct Labor Hours Machine Hours Product Units per Unit per Unit Rings 1,010 6 7 Dmos 1,890 10 All of the machine hour take place in the Fabrication Department, which has estimated total factory overhead of 8,700 of the labor hours take place in the Assembly Department, which has estimated total factory over $7.200 Aution Company was the multiple production depuitment factory overhead rate method. The Fabrication Department uses machine bours as an miocation base, and the Assembly Department drect labore The Assembly Departments inctory overhead robes 112 perche 5.pl Previous Nee Emer WE ALSO Gracing O 9 12:29 PM t/2020 / Presen Home End Pgup 90 Pyon Oms 13 & 96 5 ( 9 BI 4 6 8 0 R T Y U o F G H K V B N M Challenger Factory produces two similar products regular widgets and deluxe widgets. The total factory overhead budget $594,100 with 339.100 estimated direct labor hours. Deluxe widget production requires 4 direct labor hours for each unit, and regular widet production requires 2 direct labor hours for each unit Using a single plantwide factory overhead rote with an location base of direct lobor hours, the factory read the lenger Factory will allocate to Beluxe widget production budgeted production for the period for den widgets i 40,000 units and actual production of widgets for the period is 58,000 units would be 2014 Ob Previous Next As for Grading 12:29 PM 11/9/2000 Presen Home End Poup POD ins re EW $ 4 Ba 5 6 7 8 9 0 R Y U O P F F G H J K ? V B N M

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions