Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Can I please get the report of this assignment I mean the project requirements and contents in the MS word not just answer in one

Can I please get the report of this assignment I mean the project requirements and contents in the MS word not just answer in one picture.
image text in transcribed
MNS03 Page 4 of 13 Problem Based Learning (PBL) Exercises from Week 2-11 1) Network design proposal for casino Project Scope The project aims to design a network for a casino. The casino has 10 floors including the ground floor. The ground floor has a lobby area. Each floor also has a lobby area. There are 40 rooms in each floor, each of which has a network point to which the guest PC is connected. The casino nerwork has two servers which are used by the staff. A high speed internet connection is available which is to be shared by the guest and staff network. There is a total of 25 staff in the casino based at the ground floor Project requirement 2, Identify the hardware required such as routers, switches, access points network has to be segregated into guest and staff The guest network should not have access to the staff network. 5. Network design and IP address table. 6. Configurations and features on the devices Contents Project Scope Project requirements Hardware analysis *Topology diagram Network design strategy iPaddressestableincludingnetmask (with lustification) MNS03 Page 4 of 13 Problem Based Learning (PBL) Exercises from Week 2-11 1) Network design proposal for casino Project Scope The project aims to design a network for a casino. The casino has 10 floors including the ground floor. The ground floor has a lobby area. Each floor also has a lobby area. There are 40 rooms in each floor, each of which has a network point to which the guest PC is connected. The casino nerwork has two servers which are used by the staff. A high speed internet connection is available which is to be shared by the guest and staff network. There is a total of 25 staff in the casino based at the ground floor Project requirement 2, Identify the hardware required such as routers, switches, access points network has to be segregated into guest and staff The guest network should not have access to the staff network. 5. Network design and IP address table. 6. Configurations and features on the devices Contents Project Scope Project requirements Hardware analysis *Topology diagram Network design strategy iPaddressestableincludingnetmask (with lustification)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Modern Database Management

Authors: Jeff Hoffer, Ramesh Venkataraman, Heikki Topi

13th Edition Global Edition

1292263350, 978-1292263359

More Books

Students also viewed these Databases questions

Question

Understand the goals of succession planning

Answered: 1 week ago