Answered step by step
Verified Expert Solution
Question
1 Approved Answer
can someone answer this for me by 12 tonight thanks!!!!!! need help asap 272 ment X fx B D E PART 1 Fixed and Variable
can someone answer this for me by 12 tonight thanks!!!!!! need help asap
272 ment X fx B D E PART 1 Fixed and Variable Cost Determinations Unit Cost Calculations The projected cost of a comp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp are Lampki Direct Labor Variable Overhead Fred Overhead $160000000 peramp 20000000 per lamp (4 mph) 20000000 per lamp 100000000 per lamp (based on normal capacity of 25,000 Samps) Cost per lamp $300000000 per em Expected increases for 2012 When calculating projected increases round to TWO (5000) decimal places 1. Material Costs are expected to increase by 6 50% 2 Labor Costs are expected to increase by 300% 3 Variable Overhead is expected to increase by 6 50% 4 Ford Overhead is expected to increase to $275,000 Fred Administrative expenses are expected to increase to $58,000 6. Varble soling expenses (moured on a perlomo s) are expected to increase by 5.00% 7 Foed sang expenses are expected to be $33,000 in 2022 8 Variable administrative expenses (measured a perform besis) are expected to Increase by 3 50% On the following schedule develop the following figures 1. 2012 Proyected Variable Manufacturing Unt Cost of a loro 2 202 Projected Vanable Unt Cost per com 3.2012 Projected Fred Costs FAQ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 eady 16 17 18 PRE Type here to search C 272 ment X fx B D E PART 1 Fixed and Variable Cost Determinations Unit Cost Calculations The projected cost of a comp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp are Lampki Direct Labor Variable Overhead Fred Overhead $160000000 peramp 20000000 per lamp (4 mph) 20000000 per lamp 100000000 per lamp (based on normal capacity of 25,000 Samps) Cost per lamp $300000000 per em Expected increases for 2012 When calculating projected increases round to TWO (5000) decimal places 1. Material Costs are expected to increase by 6 50% 2 Labor Costs are expected to increase by 300% 3 Variable Overhead is expected to increase by 6 50% 4 Ford Overhead is expected to increase to $275,000 Fred Administrative expenses are expected to increase to $58,000 6. Varble soling expenses (moured on a perlomo s) are expected to increase by 5.00% 7 Foed sang expenses are expected to be $33,000 in 2022 8 Variable administrative expenses (measured a perform besis) are expected to Increase by 3 50% On the following schedule develop the following figures 1. 2012 Proyected Variable Manufacturing Unt Cost of a loro 2 202 Projected Vanable Unt Cost per com 3.2012 Projected Fred Costs FAQ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 eady 16 17 18 PRE Type here to search C Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started