Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

can someone help me?! Cost Analysis #1 [1] A shipment originates on April 12th at Last Chance Manufacturing in Boondock, New Jersey. It is made

image text in transcribed

can someone help me?!

Cost Analysis #1 [1] A shipment originates on April 12th at Last Chance Manufacturing in Boondock, New Jersey. It is made up of 60 55-pound boxes, each measuring 2'x2x1.5' and is headed to Desperation Wholesalers in Savannah, Georgia. [2] An S400 PUD truck departs WBG Servicenter at 0830 and returns at 1800 hours. The vehicle travels 135 miles, averaging 30mph while driving. The PUD driver makes a total of 12 stops (54 shipments involved total). The stop at Last Chance lasts from 1115 to 1230 hours. The Desperation shipment and three others are picked up at Last Chance Manufacturing, and one shipment is dropped off. [3] Upon return to the service center, the shipment is placed in a #53000 trailer for movement to the SAV Servicenter. An LH500 Tractor departs at 2045 with the trailer on the same day. The weight of the revenue freight being carried is 36,000 pounds (the trailer holds 45,000 pounds). The volume of the trailer is nearly full with 3480 of the 3600 cubic feet being used on average during the trip. A stop is made at Salisbury, North Carolina, to drop off part of the load and to pick up more items. The shipment to Desperation Wholesalers stays on the trailer. The tractor/trailer pair arrives at SAV at 1730 on April 13th. [4] The shipment for Desperation Wholesalers moves through the SAV terminal to a tractor/trailer combination using a 28000 trailer and a PD200 tractor. This local run leaves at 0730, April 14th, for local loads and deliveries in the Savannah area (averaging 14 tons of cargo during the run). Delivering the load at Desperation takes from 0915 to 0945. Total travel time is 5 hours at an average speed of 20mph. The truck returns to SAV at 1630. [5] Use $2.97 for diesel cost, not the $0.90 in the text and examples. Using copies of the blank Motor Carrier Costing worksheet, for this Shore Transportation movement, calculate the following carrier costs. Attach a copy of your typed calculations. [A] Total carrier cost for this shipment. [B] Carrier cost per box for this shipment. [C] Carrier cost per cwt for this shipment. [D] Carrier cost per revenue ton for this shipment. Cost Analysis #1 [1] A shipment originates on April 12th at Last Chance Manufacturing in Boondock, New Jersey. It is made up of 60 55-pound boxes, each measuring 2'x2x1.5' and is headed to Desperation Wholesalers in Savannah, Georgia. [2] An S400 PUD truck departs WBG Servicenter at 0830 and returns at 1800 hours. The vehicle travels 135 miles, averaging 30mph while driving. The PUD driver makes a total of 12 stops (54 shipments involved total). The stop at Last Chance lasts from 1115 to 1230 hours. The Desperation shipment and three others are picked up at Last Chance Manufacturing, and one shipment is dropped off. [3] Upon return to the service center, the shipment is placed in a #53000 trailer for movement to the SAV Servicenter. An LH500 Tractor departs at 2045 with the trailer on the same day. The weight of the revenue freight being carried is 36,000 pounds (the trailer holds 45,000 pounds). The volume of the trailer is nearly full with 3480 of the 3600 cubic feet being used on average during the trip. A stop is made at Salisbury, North Carolina, to drop off part of the load and to pick up more items. The shipment to Desperation Wholesalers stays on the trailer. The tractor/trailer pair arrives at SAV at 1730 on April 13th. [4] The shipment for Desperation Wholesalers moves through the SAV terminal to a tractor/trailer combination using a 28000 trailer and a PD200 tractor. This local run leaves at 0730, April 14th, for local loads and deliveries in the Savannah area (averaging 14 tons of cargo during the run). Delivering the load at Desperation takes from 0915 to 0945. Total travel time is 5 hours at an average speed of 20mph. The truck returns to SAV at 1630. [5] Use $2.97 for diesel cost, not the $0.90 in the text and examples. Using copies of the blank Motor Carrier Costing worksheet, for this Shore Transportation movement, calculate the following carrier costs. Attach a copy of your typed calculations. [A] Total carrier cost for this shipment. [B] Carrier cost per box for this shipment. [C] Carrier cost per cwt for this shipment. [D] Carrier cost per revenue ton for this shipment

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Hospitality Financial Accounting

Authors: Jerry J. Weygandt, Donald E. Kieso, Paul D. Kimmel, Agnes L.

2nd Edition

9780470598092, 470083603, 978-0470083604

More Books

Students also viewed these Accounting questions

Question

Why do you think production takes places overnight?

Answered: 1 week ago