Question

1 Approved Answer

Can you create a WBS from this information:Work Breakdown Structure (WBS) for Tiger Trahan Residence Project: Project Initiation (Feb 2 - Feb 15, 2024) 1.1

Can you create a WBS from this information:Work Breakdown Structure (WBS) for Tiger Trahan Residence Project: Project Initiation (Feb 2 - Feb 15, 2024) 1.1 Finalize Contract Agreements 1.2 Define Project Scope, Goals, and Deliverables 1.3 Conduct Initial Site Assessments Design Phase (Feb 16 - Mar 30, 2024) 2.1 Collaborate on Design Preferences with Mrs. Trahan 2.2 Develop Architectural Plans and Obtain Approvals 2.3 Engage Landscape Architects for Design Integration Permitting and Approvals (Mar 31 - Apr 15, 2024) 3.1 Submit Plans for Permits 3.2 Address Feedback or Revisions Promptly Site Preparation (Apr 16 - Apr 30, 2024) 4.1 Clear Construction Site 4.2 Begin Foundation Work Structural Construction (May 1 - Jun 30, 2024) 5.1 Commence Framing and Structural Work 5.2 Regular Structural Inspections Mechanical and Electrical Installation (Jul 1 - Aug 15, 2024) 6.1 Install Plumbing, Electrical, and HVAC Systems 6.2 Coordinate Inspections for Compliance Interior Finishing (Aug 16 - Oct 15, 2024) 7.1 Complete Interior Details 7.2 Collaborate with Mrs. Trahan on Interior Design Exterior Landscaping (Oct 16 - Nov 30, 2024) 8.1 Execute Landscaping Plans 8.2 Install Outdoor Features Final Inspections and Quality Assurance (Dec 1 - Dec 15, 2024) 9.1 Conduct Comprehensive Inspections 9.2 Ensure All Quality Standards Are Met Client Walkthrough and Approval (Dec 16 - Dec 31, 2024) 10.1 Conduct a Walkthrough with Mrs. Trahan 10.2 Address Final Adjustments or Concerns Project Handover (Jan 1, 2025) 11.1 Complete Documentation and Handover Processes 11.2 Provide Keys, Manuals, and Warranties to Mrs. Trahan Discussion on 3 Work Areas Where Constraints Typically Occur: Permitting and Approvals: Constraints may arise due to delays in obtaining necessary permits from regulatory bodies. Unexpected revisions or feedback can extend this phase, affecting the overall project timeline. Site Preparation: Environmental restrictions, unexpected site conditions, or issues with land clearing can pose challenges during site preparation, leading to potential delays in later construction phases. Mechanical and Electrical Installation: Coordination challenges, inspections, and compliance issues with plumbing, electrical, and HVAC installations can result in delays. The availability of specialized contractors and the complexity of systems may contribute to constraints in this phase. It is crucial to closely watch and address these potential constraints to ensure smooth and prompt project completion. Regular communication and proactive problem-solving are key components of successful project management

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Small Business Management Launching And Growing Entrepreneurial Ventures

Authors: Justin G. Longenecker, J. William Petty, Leslie E. Palich, Frank Hoy

19th Edition

0357039416, 9780357039410

More Books

Students also viewed these General Management questions

Question

Explain in detail the different methods of performance appraisal .

Answered: 1 week ago