Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Can you please solve the question in hand-writing? 3) An order of 150 units of a product is processed on operation 1 and then operation
Can you please solve the question in hand-writing?
3) An order of 150 units of a product is processed on operation 1 and then operation 2. The setup time on Operation 1 30 minutes and the run time per piece is 6 minutes. The setup time on operation 2 is 50 minutes and the run time is 3 minutes per piece. It takes 35 minutes to move a lot between A and B a) Calculate total manufacturing lead time (MLT) without operation overlapping. b) It is decided to overlap two operations and to split 150 units into two lots. Determine the size of sublots if the aim is to minimize idle time on the second operation and calculate total manufacturing lead time (MLT) if operations are overlapped. c) Now assume that we consider the operation overlapping and splitting together and each operation is split between two machines. By how much is MLT reduced with no setup offset (Setup offset means that the operator sets up the second machine after the first machine is set up)? By how much is MLT reduce with setup offset? d) Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started