Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Carter, Inc. produces two different products, Product A and Product B. Carter uses a traditional volume-based costing system in which direct labor hours are the

Carter, Inc. produces two different products, Product A and Product B. Carter uses a traditional volume-based costing system in which direct labor hours are the allocation base. Carter is considering switching to an ABC system by splitting its manufacturing overhead cost across three activities: Design, Production, and Inspection. The cost of each activity and usage of the activity drivers are as follows:

Cost Usage by Product A Usage by Product B
Design (Engineering Hours) $ 352,800 230 330
Production (Direct Labor Hours) $ 479,300 103,000 303,000
Inspection (Batches) $ 243,800 330 130

Carter manufactures 10,300 units of Product A and 7,800 units of Product B per month. Required:

a. Calculate the predetermined overhead rate under the traditional costing system. (Round your answer to 2 decimal places.) b. Calculate the activity rate for Design. c. Calculate the activity rate for Machining. (Round your answer to 2 decimal places.) d. Calculate the activity rate for Inspection. e. Calculate the indirect manufacturing costs assigned to each unit of Product A under the traditional costing system. (Round your intermediate calculations to two decimal places. Round your answer to 2 decimal places.) f. Calculate the indirect manufacturing costs assigned to each unit of Product B under the traditional costing system. (Round your intermediate calculations to two decimal places. Round your answer to 2 decimal places.) g. Calculate the indirect manufacturing costs assigned to each unit of Product A under the ABC system. (Do not round intermediate calculations. Round your answer to 2 decimal places.) h. Calculate the indirect manufacturing costs assigned to each unit of Product B under the ABC system. (Do not round intermediate calculations. Round your answer to 2 decimal places.) i. Which product is under-costed and which is over-costed under the volume-based cost system compared to ABC?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Environmental Health And Safety Audits

Authors: Lawrence B. Cahill, Raymond W. Kane

9th Edition

1605907081, 9781605907086

More Books

Students also viewed these Accounting questions