CASE 3A AUERBACH ENTERPRISES Auerbach Enterprises manufactures air conditioners for automobiles and trucks manufactured throughout North America. The company designs its products with flexibility to

CASE 3A AUERBACH ENTERPRISES

Auerbach Enterprises manufactures air conditioners for automobiles and trucks manufactured throughout North America. The company designs its products with flexibility to accommodate many makes and models of automobiles and trucks. The companys two main products are MaxiFlow and Alaska. MaxiFlow uses a few complex fabricated parts, but these have been found easy to assemble and test. On the other hand, Alaska uses many standard parts but has a complex assembly and testing process. MaxiFlow requires direct materials costs which total $135 per unit, while Alaskas direct materials requirements total $110 per unit. Direct labor costs per unit are $75 for MaxiFlow and $95 for Alaska.

Auerbach Enterprises uses machine hours as the cost driver to assign overhead costs to the air conditioners. The company has used a company-wide predetermined overhead rate in past years, but the new controller, Bennie Leon, is considering the use of departmental overhead rates beginning with the next year.

The following planning information is available for the next year for each the four manufacturing departments within the company:

Overhead Machine

Costs Hours

Radiator parts fabrication.............. $ 80,000 10,000

Radiator assembly, weld, and test.... 100,000 20,000

Compressor parts fabrication.......... 120,000 5,000

Compressor assembly and test........ 180,000 45,000

Total $480,000 80,000

Normally, the air conditioners are produced in batch sizes of 20 at a time. A production batch of 20 units requires the following number of hours in each department:

MaxiFlow Alaska

Radiator parts fabrication........... 28 16

Radiator assembly, weld, and test....... 30 74

Compressor parts fabrication......... 32 8

Compressor assembly and test......... 26 66

Total 116 164

Required:

1. Compute the departmental overhead rates using machine hours as the cost driver.

2. Compute a company-wide overhead rate using machine hours as the cost driver.

3. Compute the overhead costs per batch of MaxiFlow and Alaska assuming:

(a) The company-wide rate.

(b) The departmental rates.

4. Compute the total costs per unit of MaxiFlow and Alaska assuming:

(a) The company-wide rate.

(b) The departmental rates.

5. Is one product affected more than the other by use of departmental rates rather than a company-wide rate? Why or why not?

For Questions 1 through 4, you will need to complete several calculations. Be sure to label and clearly identify your work to demonstrate your understanding of the concept even if you arrive at the incorrect answer. The calculations should be included as part of your analysis and written recommendations required for submission.

For Question 5, fully address managements concerns as part of your written analysis and recommendation using the new or the previous calculations to support your recommendation/explanation.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting And Reporting A Global Perspective

Authors: Herv Stolowy, Yuan Ding

5th Edition

1473740207, 978-1473740204

More Books

Students also viewed these Accounting questions

Question

What is the biggest compliment you can give someone?

Answered: 1 week ago