CASE STUDIES Jackson Manufacturing Company Kathleen McFadden, vice president of operations at Jackson Manufacturing Company, has just
Fantastic news! We've Found the answer you've been seeking!
Question:
CASE STUDIES
Jackson Manufacturing Company
Kathleen McFadden, vice president of operations at Jackson
Manufacturing Company, has just received a request for quote
RFQ from DeKalb Electric Supply for units per week of a
motor armature. The components are standard and either easy to
work into the existing production schedule or readily available
from established suppliers on a JIT basis. But there is some dif
ference in assembly. Ms McFadden has identified eight tasks that
Jackson must perform to assemble the armature. Seven of these
tasks are very similar to ones performed by Jackson in the past;
therefore, the average time and resulting labor standard of those
tasks is known.
The worker had a performance rating. The task can
be performed in a sitting position at a welldesigned ergonomic
workstation in an airconditioned facility. Although the arma
ture itself weighs pounds, there is a carrier that holds it so
that the operator need only rotate the armature. But the detail
work remains high; therefore, the fatigue allowance should be
The company has an established personal allowance of Delay
should be very low. Previous studies of delay in this department
average This standard is to use the same figure.
The workday is hours, but operators are paid for hours
at an average of $ per hour.
The eighth task, an overload test, requires performing a task that
is very different from any performed previously, however. Kathleen
has asked you to conduct a time study on the task to determine the
standard time. Then an estimate can be made of the cost to assemble
the armature. This information, combined with other cost data, will
allow the firm to put together the information needed for the RFQ
To determine a standard time for the task, an employee from
an existing assembly station was trained in the new assembly pro
cess. Once proficient, the employee was then asked to perform the
task times so a standard could be determined. The actual times
observed in minutes were as follows:
Discussion Questions
In your report to Ms McFadden, you realize you will want to
address several factors:
How big should the sample be for a statistically accurate stand
ard at say, the confidence level and accuracy of
Is the sample size adequate?
How many units should be produced at this workstation per day?
What is the cost per unit for this task in direct labor cost?
Source: Professor Hank Maddux, Sam Houston State University