Case Study 3 National Cable Factory is one of the leading manufacturer of Medium Voltage power cables (MV Cables) and Low Voltage power cables (LV

Case Study 3
National Cable Factory is one of the leading manufacturer of Medium Voltage power cables (MV Cables) and Low Voltage power cables (LV Cables) in Oman. The market demand survey conducted by the company found that the minimum demand per week for MV cables is 30 and the minimum demand for LV cables is only 10. MV cables requires five production hours and five skilled labour hours to produce one unit whereas LV cables require three production hours and six skilled labour hours to produce one unit. The total production hours and skilled labour hours available per week are 180 and 240 respectively. Material constraint indicates the limitations of only 100 units for the requirement of two units of material per unit of MV Cables and LV Cables each. LV cables generates a contribution of RO 350 per unit and MV cable contributes RO 200 per unit.
The company wishes to adopt Linear Programming Model to determine the optimum production mix of MV Cables and LV Cables. As a Production Manager, advise National Cable Factory how many units of Medium Voltage power cables (MV Cables) and Low Voltage power cables (LV Cables) need to be manufactured in a week. Also, calculate the maximum profit earned by National Cable Factory per week.
(3+5+2 = 10 Marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions