Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Case Study of Decision Model Subject from BBA: The Bismillah Textile Mill satisfies all demand with either its own fabric or fabric purchased from another

Case Study of Decision Model Subject from BBA:

image text in transcribed

The Bismillah Textile Mill satisfies all demand with either its own fabric or fabric purchased from another mill. Fabrics that cannot be woven at the Bismillah Mill because of limited loom capacity will be purchased from another mill. The purchase price of each fabric is also shown in Table A.

Managerial Report

Develop a model that can be used to schedule production for the Bismillah Textile Mill, and at the same time, determine how many yards of each fabric must be purchased from another mill. Include a discussion and analysis of the following items in your report:

1. The final production schedule and loom assignments for each fabric.

2. The projected total contribution to profit.

3. A discussion of the value of additional loom time. (The mill is considering purchasing a ninth flying shuttle loom. What is your estimate of the monthly profit contribution of this additional loom?)

4. A discussion of the objective coefficients ranges.

5. A discussion of how the objective of minimizing total costs would provide a different model than the objective of maximizing total profit contribution. (How would the interpretation of the objective coefficients ranges differ for these two models?

CASE 1 SCHEDULING OF BISMILLAH TEXTILE MILL The Bismillah Textile Mill produces five different fabrics. Each fabric can be woven on one or more of the mill's 38 looms. The sales department's forecast of demand for the next month is shown in Table A, along with data on the selling price per meter, variable cost per meter, and purchase price per meter. The mill operates 24 hours a day and is scheduled for 30 days during the coming month. TABLE A: MONTHLY DEMAND, SELLING PRICE, VARIABLE COST, AND PURCHASE PRICE DATA FOR BISMILLAH TEXTILE MILL FABRICS Demand (meters) Selling Price ($/meter) Variable Cost ($/meter) Purchase Price ($/meter) Fabric 1 16,500 0.99 0.66 0.80 2 22,000 0.86 0.55 0.70 3 62,000 1.10 0.49 0.60 4 7,500 1.24 0.51 0.70 5 62,000 0.70 0.50 0.70 The mill has two types of looms: flying shuttle and regular. The flying shuttle looms are more versatile and can be used for all five fabrics. The regular looms can produce only three of the fabrics. The mill has a total of 38 looms: 8 are flying shuttle and 30 are regular. The rate of production for each fabric on each type of loom is given in Table B. The time required to change over from producing one fabric to another is negligible and does not have to be considered. TABLE B: LOOM PRODUCTION RATES FOR THE SCOTTSVILLE TEXTILE MILL Loom Rate (meters/hour) Fabric Flying Shuttle Regular 1 4.63 2 4.63 3 5.23 5.23 4 5.23 5.23 5 4.17 4.17 Note: Fabrics 1 and 2 can be manufactured only on the flying shuttle loom

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Income Tax Fundamentals 2013

Authors: Gerald E. Whittenburg, Martha Altus Buller, Steven L Gill

31st Edition

1111972516, 978-1285586618, 1285586611, 978-1285613109, 978-1111972516

Students also viewed these Accounting questions