Case Study: Seneca Construction is a non for profit organization. The organization does different social projects in Ontario. This year Seneca Constructions is helping restaurant
Case Study: Seneca Construction is a non for profit organization. The organization does different social projects in Ontario. This year Seneca Constructions is helping restaurant owners to set up for patio dining at a 50% discounted rate. You have been hired as a team member for one of such projects. We are meeting the customer this week.
Kindly, follow the WBS for providing the project budget.
Jack & Jill Patio Setup Project Project Scope Approval Design Phase Construction Phase Turnover Phase Submission of Initial meeting Site inspection Site Floor Plan Interior Design construction Construction Proper Finalsite inspection with measurement/surveying Electrical Plan Site Preparation Electrical Wiring Furnitures and government permits Decorations owner and approved drawings Confirmation of project scope Rough draft approval Detailed electrical plan creation Interior design creation Excavation Roofing Cable Laying Furniture procurement Signing of needed or construction documents Submission of cost Detailed floor plan Detailed electrical plan quotation creation approval Interior design approval Foundation Walls and Sidings Testing Decor procurement Creation of Contract/Termsof Detailed floor plan approval Footings Stairs Installation Reference Contract/Termsof Reference Signing FlooringEstimated Hourly Onsite Activity Task Name Time Total Cost Tranportat Insurance Equipmen Printing Rate ion Lunch TOTAL COST (hours) 105,000.00 1 Inspection IN Review Design Purchase Testing Equipment A Receive equipment Arrange the delivery time Arrange the resources to receive delivery Detailed inspections 5,403.50 Inspect equipment Labor Cost Non Labor Cost 1,079.50 Develop Inspection Critera 1.50 50.00 75.00 75.00 Agree on Criteria Inernally 1.00 75.00 75.00 75.00 Present criteria to customer 0.50 75.00 37.50 Discuss porposed changes 0.50 75.00 37.50 37.50 Finalize Inspection documents 1.00 75.00 75.00 75.00 Conduct Inspection 3.50 100.00 350.00 150.00 150.00 80.00 730.00 Sign off 0.50 75.00 37.50 12.00 49.50 Update powe 1,824.00 Review of the design 4.00 48.00 192.00 192.00 Evaulate the current power supply 4.00 48.00 192.00 192.00 Purchase new power supply 2.00 48.00 96.00 96.00 Installation and testing 8.00 48.00 384.00 384.00 inal inspectiona and approvals 8.00 120.00 960.00 960.00 8 Inspect radiation barriers 2500.00 Develop Inspection Critera 4.00 150 600.00 500.00 Conduct tests to create radtionals 0.50 150 75.00 1,000.00 1075 Get the radiations readings/measures 0.50 150 75.00 75.00 Measure the resturs against standards 1.00 150 150.00 150.00 Validate results and sign off 4.00 150 600.00 500.00 9 Lab ready for installation 10 Lab setup 1: Mark floors for equipment Move equipment in 13 Install MRI monitors 14 Install Testing Equipment 1 Replace desks 16 Lab ready for training Certification 1 Schedule training 1 Conduct full test 20 Adjust equipment 21 Conduct training 22 Ready for TestingStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started