Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

CASE STUDY Trans LAN Project Trans Systems is a small, information systems consulting firm located in Meridian, Louisiana. Trans has just been hired to design

CASE STUDY

Trans LAN Project

Trans Systems is a small, information systems consulting firm located in Meridian, Louisiana. Trans has just been hired to design and install a local area network (LAN) for the city of Meridian's social welfare agency. You are the manager for the project, which includes one Trans professional and two interns from a local university. You have just finished a preliminary scope statement for the project (see below). You are now brainstorming potential risks associated with the project.

Project Scope Statement: Objective: To design and install a new local area network (LAN) within one month with a budget not to exceed $90,000 for the Meridian Social Service Agency and with minimum disruption to ongoing operations.

Deliverables:

  • 20 Workstations and 20 laptop computers
  • Server with dual-core processors on Windows R2 server and workstation operating system (Windows 7)
  • Migration of existing databases and programs to new system
  • Four hours of introductory training for client's personnel
  • 16 hours of training for client network administrator
  • Fully operational LAN system

Milestones:

  • Hardware by Jan 22
  • Setting users' priority and authorization by Jan 26
  • In-house whole network test completed Feb 1
  • Client site test completed Feb 2 and Training completed by Feb 16

Technical Requirements:

  • Workstations with 17-inch flat panel monitors, dual-core processors, 4GB RAM, DVD +RW, wireless card, Ethernet card, 500 GB Hard disk laptops with 12-inch display and similar specs to workstations
  • Wireless network interface cards and Ethernet Connections
  • System must support Windows Vista/Windows 7 platforms
  • System must provide secure external access for field workers' constraints
  • On-site work to be done after 8 pm and before 7 am (Mon - Sat)
  • System maintenance and repair only up to one month after final inspection
  • Warranties transferred to client
  • Only responsible for installing software designated by the client. Client will be billed for additional training beyond that prescribed in the contract. Customer Review: Director of the city of Meridian's Social Service Agency
  • Read the case study carefully and answer the following questions:

1. Identify potential risks associated with this project. Try to come up with at least five different risks.

2. Develop a Risk Assessment Matrix that accurately calculates the likelihood, impact, and opportunity associated with the risks that you have identified.

3. Make an action plan that appropriately responds to these risks.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Microeconomics

Authors: Austan Goolsbee, Steven Levitt, Chad Syverson

2nd edition

1464187029, 978-1464189104, 1464189102, 978-0716759751, 716759756, 978-1464187025

Students also viewed these General Management questions

Question

=+ What is Pats minimax choice?

Answered: 1 week ago