Caterpillar produces a specific tractor equipment in its Colombia manufacturing facility. This equipment has multi-function capability in various climatic condition. The design of the
Caterpillar produces a specific tractor equipment in its Colombia manufacturing facility. This equipment has multi-function capability in various climatic condition. The design of the poduction process of this equipment needs to be very specific and precise. The daily demand of this equipment is estimated to be 60 units and the production time available for production of the equipment is 200 minutes per day. Given the following information of task time and task sequences: Task A BCDEFGH | Task Time (minutes) 1 2 2 1 3 1 1 2 2 Predecessors A A C D, E, F B G, H a) The correct precedence relationship with one of the possible assignment of tasks to workstations is shown in d) The idle time for the assembly line per cycle = whole number). b) The operating efficiency of the assembly line with 5 workstations shown in the figure chosen above =% (enter your response as a percentage rounded to one decimal place). c) The theoretical minimum number of workstations = (round your response up to the next whole number). minute(s) (enter your response as a C Fig. 1 Fig. 2 Fig. 3 F F
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Answer a Based on the precedence relationships and one possible assignment of tasks to workstations ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started