Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

CBA Manufacturing produces custom built pollution control devices for medium steel mills. The following are the most recent project undertaken by the company. Activity Predecessors

CBA Manufacturing produces custom built pollution control devices for medium steel mills. The following are the most recent project undertaken by the company. Activity Predecessors Optimistic Most Likely Pessimistic Cost per day and Crash Cost per Day A - 20 30 40 1500 B A 20 65 80 3500 C A 50 60 100 4000 D C 30 50 100 1900 E B 25 30 35 9500 F E 0.0 0.0 0.0 0 G D,F 25 30 35 2500 H G 10 20 30 2000 I H 20 25 60 2000 J H 8 10 12 6000 K J 0.0 0.0 0.0 0 L I,K 20 25 60 4500 Use two decimal places

1. Activity expected time is _____. 2. Total critical path is ____ days. 3. Total critical path cost is ____ pesos. 4. The total standard deviation of critical path is ____ days. use two decimal places 5. The probability (z value) of finishing the project in 270 days is ____. (use two decimal places) 6. If it is necessary to crash by 10 days, After crashing the project, the total expected time of project completion is ____ days. 7. If it is necessary to crash by 10 days, Assuming that the optimistic time estimates can be used as crash time. 8. The total crash cost for Activity A is _____ pesos.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Business Statistics

Authors: Robert A Donnelly, Robert Donnelly Jr

2nd Edition

0133852288, 9780133852288

More Books

Students also viewed these General Management questions

Question

What does this look like?

Answered: 1 week ago