Ccan you assist me inthis WBSConsider a home remodeling/construction project for which you are the project manager. This project involves redesigning kitchen, living room, bathrooms
Ccan you assist me inthis WBSConsider a home remodeling/construction project for which you are the project manager. This project involves redesigning kitchen, living room, bathrooms and bedrooms. There are various project stages/tasks for the home remodeling project ranging from designing the rooms to implementing the new design. From the project managers viewpoint, it is essential to have a Work Breakdown Structure (WBS) for the project. Describe the tasks, dependencies, hours of work, status, cost, start date and planned, estimated, and actual completion dates using Microsoft Project/Excel software. Make sure you indicate subtasks for at least 6 tasks. Some of the tasks are included below:
Requirements | |
1 | Conduct Home Survey |
2 | Obtain Owners Requirements |
3 | Design of Living Room |
4 | Design of Kitchen |
5 | Design of Bedroom |
6 | Measuring Flooring for Wood, Carpet |
7 | Measuring Cabinet/Closet |
8 | Obtain Owners' Acceptance of the New Design |
9 | Obtain Tools & Fixtures |
Kitchen | |
10 | Select Wood Flooring |
11 | Select & Purchase Final Paint Color |
12 | Select Material for Cabinets |
13 | Select Material for Doors, Windows |
14 | Prepare Materials |
15 | Install flooring |
16 | Install New Cabinets |
17 | Fixing Doors, Window |
18 | Color: Primary Coats |
19 | Color: Final Coats |
20 | Touch ups |
21 | Fixing Water Fixtures |
22 | Water Agency |
Master Bedroom & Bathroom | |
23 | Select Carpet, Wood Flooring |
24 | Select & Purchase Final Paint Color |
25 | Select Material for Closet |
26 | Select Material for Doors, Windows |
27 | Preparing Materials |
28 | Installing Bedroom Carpet |
29 | Installing Closets |
30 | Fixing Doors, Window |
31 | Color Primary Coats |
32 | Color Final Coats |
33 | Touch ups |
34 | Fixing Bathroom Flooring |
35 | Fixing Water Fixtures |
36 | Water Agency |
You are expected to show at least 50 tasks, 15 dependencies, and include hours of work, status, cost, start date and planned, estimated, and actual completion dates for each task. Six of the tasks should have two subtasks each. There is leeway on the tasks/subtasks you include and the dependencies you consider are relevant.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started