Ccan you assist me inthis WBSConsider a home remodeling/construction project for which you are the project manager. This project involves redesigning kitchen, living room, bathrooms

Ccan you assist me inthis WBSConsider a home remodeling/construction project for which you are the project manager. This project involves redesigning kitchen, living room, bathrooms and bedrooms. There are various project stages/tasks for the home remodeling project ranging from designing the rooms to implementing the new design. From the project managers viewpoint, it is essential to have a Work Breakdown Structure (WBS) for the project. Describe the tasks, dependencies, hours of work, status, cost, start date and planned, estimated, and actual completion dates using Microsoft Project/Excel software. Make sure you indicate subtasks for at least 6 tasks. Some of the tasks are included below:

Requirements
1 Conduct Home Survey
2 Obtain Owners Requirements
3 Design of Living Room
4 Design of Kitchen
5 Design of Bedroom
6 Measuring Flooring for Wood, Carpet
7 Measuring Cabinet/Closet
8 Obtain Owners' Acceptance of the New Design
9 Obtain Tools & Fixtures
Kitchen
10 Select Wood Flooring
11 Select & Purchase Final Paint Color
12 Select Material for Cabinets
13 Select Material for Doors, Windows
14 Prepare Materials
15 Install flooring
16 Install New Cabinets
17 Fixing Doors, Window
18 Color: Primary Coats
19 Color: Final Coats
20 Touch ups
21 Fixing Water Fixtures
22 Water Agency
Master Bedroom & Bathroom
23 Select Carpet, Wood Flooring
24 Select & Purchase Final Paint Color
25 Select Material for Closet
26 Select Material for Doors, Windows
27 Preparing Materials
28 Installing Bedroom Carpet
29 Installing Closets
30 Fixing Doors, Window
31 Color Primary Coats
32 Color Final Coats
33 Touch ups
34 Fixing Bathroom Flooring
35 Fixing Water Fixtures
36 Water Agency

You are expected to show at least 50 tasks, 15 dependencies, and include hours of work, status, cost, start date and planned, estimated, and actual completion dates for each task. Six of the tasks should have two subtasks each. There is leeway on the tasks/subtasks you include and the dependencies you consider are relevant.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Database Design Application Development And Administration

Authors: Mannino Michael

5th Edition

0983332401, 978-0983332404

More Books

Students also viewed these Databases questions

Question

economics was called the "Dismal science" by Thomas Carlyle because

Answered: 1 week ago

Question

5 The mechanics of the circular flow model.

Answered: 1 week ago

Question

1 The difference between a command system and a market system.

Answered: 1 week ago

Question

4 How the market system adjusts to change and promotes progress.

Answered: 1 week ago