CD4 - Excel As you learned in the previous chapters, Current Designs has two main product lines - composite kayaks, which are handmade and very

CD4 - Excel
As you learned in the previous chapters, Current Designs has two main product lines - composite kayaks, which are handmade and
very labor-intensive, and rotomolded kayaks, which require less labor but employ more expensive equipment. Current Design's
controller, Diane Buswell, is now evaluating several different methods of assigning overhead to these products. It is important to
ensure that costs are appropriately assigned to the company's products. At the same time, the system that is used must not be so
complex that its costs are greater than its benefits.
Diane has decided to use the following activities and costs to evaluate the methods of assigning overhead.
Activities Cost
Designing new models $121,000
Creating and testing prototypes 152,000
Creating molds for kayaks 188,500
Operating oven for the rotomolded kayaks 40,000
Operating the vacuum line for the composite kayaks 28,000
Supervising production employees 180,000
Curing time :(the time that is needed for the chemical
processes to finish before the next step in
the production process; many of these
costs are related to the space required in
the building) 190,500
Total $900,000
As Diane examines the data, she decides that the cost of operating the oven for the rotomolded kayaks and the cost of operating
the vacuum line for the composite kayaks can be directly assigned to each of these products lines and do not need to be allocated
with the other costs.
Instructions
For purpose of this analysis, assume that Current Designs uses $234,000 in direct labor costs to produce 1,000 composite kayaks
and $286,000 in direct labor costs to produce 4,000 rotomolded kayaks each year.
(a) One method of allocating overhead would allocate the common costs to each product line by using a allocation basis such as
the number of employees working on each type of kayak or the amount of factory space used for the production of each type of kayak.
Diane knows that about 50% of the area of the plant and 50% of the employees work on the composite kayaks, and the remaining space
and other employees work on the rotomolded kayaks. Using this information and remembering that the cost of operating the oven
and vacuum line have been directly assigned, determine the total amount to be assigned to the composite kayak line and the
rotomolded kayak line, and the amount to be assigned to each of the units in each line.
(b) Another method of allocating overhead is to use direct labor dollars as an allocation basis. Remembering that the costs of the
oven and the vacuum line have been assigned directly to the product lines, allocate the remaining costs using direct labor
dollars as the allocation basis. Then, determine the amount of overhead that should be assigned to each unit of each product
line using this method.
(c) Activity-based costing requires a cost driver for each cost pool. Use the following information to assign the costs to the product
lines using the activity-based costing approach.
Driver Amount for Driver Amount for
Activity Cost Pools Cost Drivers Composite Kayaks Rotomolded Kayaks
Designing new models Number of models 3 1
Creating and test prototypes Number of prototypes 6 2
Creating molds for kayaks Number of molds 12 1
Supervising production kayaks Number of employees 12 12
Curing time Number of days of curing time 15,000 2,000
What amount of overhead should be assigned to each composite kayak using this method? What amount of overhead
should be assigned to each rotomolded kayak using this method?
(d) Which of the three methods do you think Current Designs should use? Why?
NOTE: Enter a number in cells requesting a value; enter either a number or a formula in cells with a "?" .
After you have completed CD4, consider the additional question.
1. Assume that the number of prototypes created for composite kayaks and rotomolded kayaks changed to 8 and 4 respectively.
Redo instruction (c) and round cost assigned /unit to two decimal points.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions