Question
Cementing services..10,000 Casing crews.12,000 Roustabout labor..16,000 Hauiling and transportation..15,000 Production casing.72,000 Tank battery.22,000 Lines and connections..11,000 Pumping unit motor and accessories..100,000 Casinghead and connections13,000 Tubing..17,000
Cementing services..10,000
Casing crews.12,000
Roustabout labor..16,000
Hauiling and transportation..15,000
Production casing.72,000
Tank battery.22,000
Lines and connections..11,000
Pumping unit motor and accessories..100,000
Casinghead and connections13,000
Tubing..17,000
Separating and treating equipment14,200
Measuring equipment.600
Downhole pump and rods.11,200
Required:
a. Classify the costs in b into IDC and L&WE.
b. Record the above transaction assuming that the well was successful.
c. Record the above transaction assuming that the well was dry if the Company paid cost of $70,000 to plug and abandoned the hole.
Hint: to save your time, you can record the IDC and L&WE in total not for each cost.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started