Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

CENT Led produces a range of products Manufacturing is undertaken using one of two processes the Upha and the Omega Procesies. All of the products

image text in transcribed

CENT Led produces a range of products Manufacturing is undertaken using one of two processes the Upha and the Omega Procesies. All of the products are manufactured in batches. The current pricing Xolicy has been to abort all overheads using direct labour hours to obtain total cout. A recent detailed nalysis has examined overhead cort, the results are: Analysis of overhead costs Cent per month Monthly volume Alpha Process Cost 192,000 960 boun Omega Process Cost 89.00 2.560 hours Set cost 85.00 530 - Handling charges 91.200 380 movements Other overheads 101,400 (see below) Total overhead costs 560.000 There are 240 detalle.cach month we af KENT's products are a Til and a GR 27. JT10ls are produced by the Alpha Process in a imple operation. GR27s manufactured by the Omega Process. Both products are sold bathemat stails of the two products are JT1103 CR7 Monthly volume 1.000 metres 500 metres Hanch size 1.000 metres 50 metres Processing time per barch Alpha 100 hours Omnia 25 hours Set-ups per batch 1 st 2 sets Handling charges par batch ovement Smovements Materials permetre [16 15 Direct labour permetre (Director) hour Sirect labour is paid at 16 per hour. 2. The overhead allocation rate per metrs, usign the traditional costing system based on direct abeer hours, is equal to 280 O 125 140 62.5 CENT Led produces a range of products Manufacturing is undertaken using one of two processes the Upha and the Omega Procesies. All of the products are manufactured in batches. The current pricing Xolicy has been to abort all overheads using direct labour hours to obtain total cout. A recent detailed nalysis has examined overhead cort, the results are: Analysis of overhead costs Cent per month Monthly volume Alpha Process Cost 192,000 960 boun Omega Process Cost 89.00 2.560 hours Set cost 85.00 530 - Handling charges 91.200 380 movements Other overheads 101,400 (see below) Total overhead costs 560.000 There are 240 detalle.cach month we af KENT's products are a Til and a GR 27. JT10ls are produced by the Alpha Process in a imple operation. GR27s manufactured by the Omega Process. Both products are sold bathemat stails of the two products are JT1103 CR7 Monthly volume 1.000 metres 500 metres Hanch size 1.000 metres 50 metres Processing time per barch Alpha 100 hours Omnia 25 hours Set-ups per batch 1 st 2 sets Handling charges par batch ovement Smovements Materials permetre [16 15 Direct labour permetre (Director) hour Sirect labour is paid at 16 per hour. 2. The overhead allocation rate per metrs, usign the traditional costing system based on direct abeer hours, is equal to 280 O 125 140 62.5

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Horngrens Accounting The Financial Chapters

Authors: Tracie Miller Nobles, Brenda Mattison

13th Edition

0136162185, 9780136162186

More Books

Students also viewed these Accounting questions

Question

Explain how to conduct an appraisal feedback interview.

Answered: 1 week ago

Question

What are the requirements for effective learning at work?

Answered: 1 week ago