Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Ch.10-Case Problem-Quality Associates, Inc. Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their

Ch.10-Case Problem-Quality Associates, Inc. Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In one particular application, a client game quality associates a sample of 800 observations taken during a time in which that client's process was operating satisfactorily. The sample standard deviation for these data was .21; hence, with so much data, the population standard deviation was assumed to be .21. Quality associates then suggested that random samples of size 30 be taken periodically to monitor the process on an ongoing basis. By analyzing the new samples, the client could quickly learn whether the process was operating satisfactorily. When the process was not operating satisfactorily, corrective action could be taken to eliminate the problem. The design specification indicated the mean for the process should be 12. The hypothesis test suggested Quality Associates follows. H0: =12 H1: 12 Corrective action will be take any time H0 is rejected. Four samples were collected at hourly intervals during the first day of operation of the new statistical process control procedure. The data are available in the data set Quality.xls. Managerial Report: 1. Conduct a hypothesis test for each sample at the .01 level of significance and determine what action, if any, should be taken. Provide the test statistic and p-value for each test. 2. Compute the standard deviation for each of the four samples. Does the assumption of .21 for the population standard deviation appear reasonable? 3. Compute limits for the sample mean X around =12 such that, as long as a new sample mean is within those limits, the process will be considered to be operating satisfactorily. If X exceeds the upper limit or if X is below the lower limit, corrective action will be taken. These limits are referred to as upper and lower control limits for quality control purposes. 4. Discuss the implications of changing the level of significance to a larger value. What mistakes or error could increase if the level of significance in increased?

Sample 1 Sample 2 Sample 3 Sample 4
11.55 11.62 11.91 12.02
11.62 11.69 11.36 12.02
11.52 11.59 11.75 12.05
11.75 11.82 11.95 12.18
11.90 11.97 12.14 12.11
11.64 11.71 11.72 12.07
11.80 11.87 11.61 12.05
12.03 12.10 11.85 11.64
11.94 12.01 12.16 12.39
11.92 11.99 11.91 11.65
12.13 12.20 12.12 12.11
12.09 12.16 11.61 11.90
11.93 12.00 12.21 12.22
12.21 12.28 11.56 11.88
12.32 12.39 11.95 12.03
11.93 12.00 12.01 12.35
11.85 11.92 12.06 12.09
11.76 11.83 11.76 11.77
12.16 12.23 11.82 12.20
11.77 11.84 12.12 11.79
12.00 12.07 11.60 12.30
12.04 12.11 11.95 12.27
11.98 12.05 11.96 12.29
12.30 12.37 12.22 12.47
12.18 12.25 11.75 12.03
11.97 12.04 11.96 12.17
12.17 12.24 11.95 11.94
11.85 11.92 11.89 11.97
12.30 12.37 11.88 12.23
12.15 12.22 11.93 12.25

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Quantitative Analysis For Management

Authors: Barry Render, Ralph M. Stair, Michael E. Hanna

11th Edition

9780132997621, 132149117, 132997622, 978-0132149112

Students also viewed these Mathematics questions

Question

Describe and draw a supply chain for a bicycle repair shop.

Answered: 1 week ago