Chapter 23 Homework PR 23-1A Direct materials and direct labor variance analysis OBJ. 2,3 Fancy Fixture Company manufactures Faucets in a small manufacturing facility. The fau cets are made from brass. Manufacturing has 100 employees. Each employee presently provides 40 hours of labor per week. Information about a production week is as follows: Standard wage per hr. $21.00 Standard labor time per faucet 20 min. Standard number of lbs. of brass 5 lbs. Standard price per lb. of brass $2.80 Actual price per lb. of brass $2.72 Actual lbs. of brass used during the week 59.875 lbs. Number of faucets produced during the week 11.820 Actual wage per hr. $21.40 Actual hrs, for the week 4,000 hrs. Instructions Determine (a) the standard cost per unit for direct materials and direct labor; (b) the di- rect materials price variance, direct materials quantity variance, and total direct materials cost variance; and (c) the direct labor rate variance, direct labor time variance, and total direct labor cost variance. PR 23-3A Direct materials, direct labor, and factory overhead cost variance OBJ. 3, 4 analysis Adamantane Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 15.000 units of product were as follows: Standard Costs Actual Costs Direct materials 5.000 lbs. at $50.00 4,950 lbs. at $50.60 Direct labor 3,000 hrs. at $25.00 2.945 hrs at $25.60 Factory overhead Rates per direct labor hr, based on 100% of normal capacity of 3.200 direct labor hrs.: Variable cost. $5.50 $16,680 variable cost Fixed cost, $4.00 $12,800 fixed cost Each unit requires 0.2 hour of direct labor. Instructions Determine (a) the direct materials price variance, direct materials quantity variance, and total direct materials cost variance; (b) the direct labor rate variance, direct labor time vari- ance, and total direct labor cost variance; and (c) the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance