Circular blanks are loaded into a deep drawing machine by an automatic loading and unloading mechanism. The loading and unloading task takes 2 0 sec

Circular blanks are loaded into a deep drawing machine by an automatic loading and unloading mechanism. The loading and unloading task takes 20 sec each cycle. The drawing operation itself takes 10 sec, including part ejection. The cost rates of the drawing machine and the automatic loading and unloading mechanism are $45/hr and $10/hr respectively. The drawing die cost $12,000 and is expected to produce a total number of drawn parts equal to the first-right five digits of your student number during its life. Batch quantity is 1300 parts. Time to set up the machine before production is 2 hr. Determine: (a) Time to complete the batch (b) Average production rate, (c) Cost per piece

Step by Step Solution

There are 3 Steps involved in it

Step: 1

a Time to complete the batch Cycle time per part Loadingunloading time per cycle 20 seconds Drawing time per cycle 10 seconds Total cycle time per part Loading time Drawing time 20 sec 10 sec 30 secon... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Precalculus

Authors: Michael Sullivan

9th edition

321716835, 321716833, 978-0321716835

More Books

Students also viewed these Mechanical Engineering questions

Question

Explain the various techniques of Management Development.

Answered: 1 week ago

Question

Find limit algebraically. x + x + 3x + 3 lim x-1 x* + x + 2x + 2

Answered: 1 week ago