Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher.
Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher. The home model is a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multi-purpose dry chemical at 480 PSI. The commercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose dry chemical at 390 PSI. Both products require 1.5 hours of direct labor for completion. Therefore, total annual direct labor hours are 96,300 or Expected annual manufacturing overhead is $1,561,700. Thus, the predetermined overhead rate is $16.22 or ($1,561,700 = 96,300) per direct labor hour. The direct materials cost per unit is $18.50 for the home model and $26.50 for the commercial model. The direct labor cost is $19 per unit for both the home and the commercial models. The company's managers identified six activity cost pools and related cost drivers and accumulated overhead by cost pool as follows: Expected Use of Drivers by Product Cost Drivers Home Pounds Activity Cost Pools Receiving Forming Assembling Machine hours Number of parts Number of tests Estimated Overhead $84,400 149,000 403,000 48,000 54,300 823,000 $1,561,700 Expected Use of Cost Drivers 335,000 35,000 217,000 25,500 5,258 335,000 215,000 27,000 165,000 15,500 3,680 215,000 Commercial 120,000 8,000 52,000 10,000 1,578 120,000 Testing Gallons Painting Packing and shipping Pounds Under traditional product costing, compute the total unit cost of each product. (Round answers to 2 decimal places, e.g. 12.25.) Home Model Commercial Model Total unit cost $ Under ABC, prepare a schedule showing the computations of the activity-based overhead rates (per cost driver). (Round overhead rate to 2 decimal places, e.g. 12.25.) Activity Cost Pool Estimated Overhead Expected Use of Cost Drivers Activity-Based Overhead Rate Receiving Pounds per pound Forming Machine hours per machine hour Assembling Parts per part " Testing Tests per test " Painting Gallons per gallon " Packing and shipping Pounds per pound " Prepare a schedule assigning each activity's overhead cost pool to each product based on the use of cost drivers. (Round overhead cost per unit to 2 decimal places, e.g. 12.25 and cost assigned to 0 decimal places, e.g. 2,500.) Home Model Expected Use of Activity-Based Drivers Overhead Rates Commercial Model Expected Use of Activity-Based Cost Assigned Drivers Overhead Rates Activity Cost Pool Cost Assigned Receiving ___ + Forming + Assembling + Testing + Painting + Packing and shipping + Total costs assigned (a) Units produced (b) Overhead cost per unit [(a) = (b)] Compute the total cost per unit for each product under ABC. (Round answer to 2 decimal places, e.g. 12.25.) Home Model Commercial Model Total cost per unit & Classify each of the activities as a value-added activity or a non-value-added activity. Activity Receiving Forming Assembling Testing Painting Packing and shipping
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started