Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes:

image text in transcribed

Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 60 parts. A part requires 5 minutes in milling and 9 minutes in finishing. The move time between the two operations for a complete batch is 10 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 5 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time 14 min 14 min Non-value-added time 836 min 56 min Total lead time 850 min X min Value-added ratio (as a percent) 1.6 % X % Feedback Check My Work Recall that lead time can be classified as one of the following: 1. Value-added lead time, which is the time spent in converting raw materials into a finished unit of product. 2. Non-value-added lead time, which is the time spent while the unit of product is waiting to enter the next production process or is moved from one process to another. In this exercise for Traditional: Value-added processing time = Milling time + Finishing time Non-value-added time = Total within-batch wait time + Move time, where Total Within-Batch Wait Time = (Total Time to Perform Operations) x (Batch Size - 1) Add value-added processing time and non-value-added processing time to obtain total processing time. Calculate Value Added Ratio = Value Added Process Time - Total Process Time In this exercise for Lean Manufacturing: Value-added processing time = Milling time + Finishing time Non-value-added time = Total within-batch wait time, where Total Within-Batch Wait Time is obtained by multiplying the process time by the remaining units in the batch (waiting their turn) There is no move time

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

College Accounting A Practical Approach Chapters 1-25

Authors: Jeffrey Slater

12th Edition

013277206X, 978-0132772068

More Books

Students also viewed these Accounting questions

Question

b ) Use R software ( R Studio ) to complete this assignment.

Answered: 1 week ago

Question

Understand highlights of legislation enacted in 1964 and beyond

Answered: 1 week ago