Compute the early, late, and slack times for the activities in the network that follows, assuming a time-constrained network. Note which activities are critical and determine the critical time-constrained project duration Note: Recall that in the schedule resource load chart the time-constrained scheduling interval (ES through LF) has been shaded. Any resource scheduled beyond the shaded area will delay the project. "TP stands for time period. Legend ES ID EF SLK RES SLK LS DUR LF 0 1 4 1 3 1 6 0 2 2 No 2 1 6 2 3 4 5 ilm 3 4 0 3 3 5 Schedule resource load chart with ES and stack updates ID 1 2. OOO 21 4 5 6 Resource Duration ES LF SLTP 1 TP 2 TP 3 TP 4 TPS TP 6 TP 7 TP TP 9 TP 10 TP 11 TP 12 TP 13 TP 14 TP 15 1 3 4 1 1 4 4 0 3 5 0 6 1 6 4 10 0 3 4 5 10 1 2 3 10 13 0 Resources scheduled Resources available 4 4 4 4 4 4 4 What is the time-constrained length of the project without regard to resources? Time-constrained length of the project Assume you have only four resources and you are using software that schedules projects by the parallel method and following heuristics. Schedule only one period at a time! Minimum slack Smallest duration Assume you have only four resources and you are using software that schedules projects by the parallel method and following heuristics. Schedule only one period at a time! Minimum slack Smallest duration Lowest identification number Keep a log of each activity change and update you make each period-e.g., period 0-1, 1-2, 2-3, etc.). The log should include any changes or updates in ES, EF, and slack times each period, activities scheduled, and activities delayed. (Hint: Remember to maintain the technical dependencies of the network.) Use the resource load chart to assist you in scheduling. List the order in which you scheduled the activities of the project Order Activity First Second Third Fourth Fifth Sixth Recompute your slack for each activity given your new schedule. What is the slack for: Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 What is the length of the project when resources are considered? Length of the project