Consider the following all-integer linear program: Max 2x + y subject to 6x + 4y 22 5x + y 12 x + 2y 8 x,
- Consider the following all-integer linear program:
Max 2x + y subject to
6x + 4y 22
5x + y 12
x + 2y 8
x, y 0 and both integers
- Graph the constraints for this problem. Use dots to indicate all feasible integer solutions. (5 marks)
- Solve the ILP for this problem when y is the only integer (x is relaxed). (4 marks)
- Find the optimal integer solution graphically (show your work). (5 marks)
- Martha Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows:
Department | Product 1 | Product 2 | Product 3 |
A | 1.1 | 1.7 | 1.30 |
B | 0.9 | 0.95 | 1.70 |
C | 1.05 | 0.85 | 2.0 |
Max production 250 100 100
Min production 40 80 35
During the next production period, the labor-hours available are 330 in department A, 350 in department B, and 200 in department C. The profit contributions per unit are $30 for product1, $28 for product 2, and $31 for product 3.
- Formulate a linear programming model for maximizing total profit contribution. (5 marks)
- Solve the linear program formulated in part (a) using excel. How many (note that number of products should be considered as integer value only) of each product should be produced, and what is the projected total profit contribution? (5 marks)
Note that you must submit your excel document as a separate document (no pictures or pdfs are allowed) in order to get credit for this question.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success