Consider the following PERT Network. Each Activity has 3 times - the optimistic, the most like and the pessimistic time. A 5,6,7 B 6,8,10
Consider the following PERT Network. Each Activity has 3 times - the optimistic, the most like and the pessimistic time. A 5,6,7 B 6,8,10 E 4,6,9 F 4,7,9 H 2,4,6 C 5,7,10 D 3,6,9 G 6,8,10 | 5,6,7 The Critical Path is