Question
Contractor contracted to install a runway lighting system requiring a double circuit underground conduit. At the direction of the government's technical personnel, the contractor changed
Contractor contracted to install a runway lighting system requiring a double circuit underground conduit. At the direction of the government's "technical personnel," the contractor changed the system to a single circuit that required the digging of several additional trenches along the taxiway. After about a month of digging, the government directed the contractor to abandon the single conduit system. Contractor claimed the added costs of digging the several trenches and the government defends claiming that its "technical personnel" had no authority to direct the change. Decide this issue.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started