Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

Cornerstone Exercise 11.4 (Algorithmic) Activity-Based Life-Cycle Costing Kagle design engineers are in the process of developing a new green product, one that will significantly reduce

Cornerstone Exercise 11.4 (Algorithmic) Activity-Based Life-Cycle Costing

Kagle design engineers are in the process of developing a new green product, one that will significantly reduce impact on the environment and yet still provide the desired customer functionality. Currently, two designs are being considered. The manager of Kagle has told the engineers that the cost for the new product cannot exceed $550 per unit (target cost). In the past, the Cost Accounting Department has given estimated costs using a unit-based system. At the request of the Engineering Department, Cost Accounting is providing both unit- and activity-based accounting information (made possible by a recent pilot study producing the activity-based data).

Unit-based system: Variable conversion activity rate: $110 per direct labor hour Material usage rate: $15 per part ABC system: Labor usage: $30 per direct labor hour Material usage (direct materials): $35 per part Machining: $85 per machine hour Purchasing activity: $160 per purchase order Setup activity: $4,000 per setup hour Warranty activity: $550 per returned unit (usually requires extensive rework) Customer repair cost: $35 per repair hour (average)

Activity and Resource Information (annual estimates)

Design A Design B
Units produced 20,000 20,000
Direct material usage 340,000 parts 315,000 parts
Labor usage 50,000 hours 120,000 hours
Machine hours 50,000 60,000
Purchase orders 3,000 2,500
Setup hours 650 300
Returned units 1,000 300
Repair time (customer) 2,100 500

Required:

1. Select the lower-cost design using unit-based costing. - Select your answer -Design ADesign BItem 1

Are logistical and post-purchase activities considered in this analysis? - Select your answer -YesNoItem 2

2. Select the lower-cost design using ABC analysis. - Select your answer -Design ADesign BItem 3

3. What if the post-purchase cost was an environmental contaminant and amounted to $20 per unit for Design A and $40 per unit for Design B? Compute the Post-purchase cost for each design.

Post-Purchase Cost
Design A $
Design B $

Assume that the environmental cost is borne by society. Now which is the better design? - Select your answer -Design ADesign B

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started