Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Cosmo Lighting Inc is a GTA based manufacturer of lighting products including table and desktop lamps, track lighting, and decorative wall lighting. The company employs

 Cosmo Lighting Inc is a GTA based manufacturer of lighting products including table and desktop lamps, track lighting, and decorative wall lighting. The company employs 90 employees, and exports 40% of its product to the USA. Approximately 60% of the employees are full-time, and the remainder are part -time and temporary. These workers are called upon to work when demand is high, and for vacation relief and to fill in for sick days. Some of their product is sold through the smaller retail lighting locations as well as to home builders for the new home market. 

Jen Davis, is the new VP of Operations and she has been very concerned about the increasing problem with rejected products found during the manufacturing operation.

Several new designs were introduced in January, and since that time rejects have been high. "Rejects have been a large source of waste since we resumed production in January", said Davis in the weekly management meeting. She feels strongly that data must be collected and analyzed in order to begin fixing the problems.

As a new graduate of Seneca College, you have been brought in to help review and analyze the quality data for Quality Lighting. Although you will not make technical recommendations, you should be able to help them figure out what the problems are and to point them in the right direction.



Process Overview:

A tour of the assembly operation indicated that there are two departments, with different equipment and employees. These two departments assemble large production runs of the various lighting products. The production planner, Amir Patel (also a Seneca grad) translates the customer orders into production requirements, then sends each order to one of the departments for assembly. Currently each department is capable of producing all of the lighting products.

After the products are assembled, they are checked by an inspector. Each product is then packed into its carton box, and then packed onto a skid for delivery to the warehouse. Currently, products that are found faulty at the final inspection are to be sent to a special team of 2 employees, in the repair department. These employees are responsible to evaluate, repair (if possible) and document their work. Some product is scrapped and discarded if it cannot be fixed. The remainder is repaired. There is a constant supply of products waiting to be evaluated by the repair team. After being repaired, products are returned to the final inspection area at the end of each department where they originated. Here they are evaluated to ensure that they are ready to ship. At the inspection area, inspectors are often needed to work overtime to inspect the products that arrive from the repair department.

Components to assemble the lighting are received in large quantities from Canadian, American and offshore suppliers. After inspection and storage, quantities for one day's production are sent directly to the different workstations of each department, every night for the next day's production. Goods that do not pass receiving inspection are held, and sent back to suppliers as soon as possible.


Ur Actions:

Ur discussions with supervisors in the facility did not yield any definite clues as to the reasons for all the defects. There seemed to be many different types of rejects piled in various locations throughout the facility.

Ur next stop was at the Quality Control Department, where u obtained the records for the Assembly Department rejects, for the last month.



Kindly Provide the following,


3. Cause and Effect , which indicates some possible reasons for the defects listed in the case. Aim for at least 4-5 points.


4. Give the top THREE recommendations to Jen Davis on how to reduce the defects at Cosmo Lighting. (one paragraph each, please number recommendations # 1,2,3)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management A Systems Approach to Planning Scheduling and Controlling

Authors: Harold Kerzner

10th Edition

978-047027870, 978-0-470-5038, 470278706, 978-0470278703

More Books

Students also viewed these General Management questions