Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Cost Chart (Work Packages) Code Description Cost 1.1.1.1 Functional Specification $250.00 1.1.1.2 Technical Specification $250.00 1.1.2.1 Logical Structure $400.00 1.1.2.2 Physical Structure $400.00 1.1.3.1 Technical
Cost Chart (Work Packages) Code Description Cost 1.1.1.1 Functional Specification $250.00 1.1.1.2 Technical Specification $250.00 1.1.2.1 Logical Structure $400.00 1.1.2.2 Physical Structure $400.00 1.1.3.1 Technical Specifications $200.00 1.1.3.2 Interface Proposals $200.00 1.1.4.1 Functional Specifications $300.00 1.1.4.2 Technical Specifications $300.00 1.1.4.3 Report Proposals $300.00 1.2.1.1 Design Review $300.00 1.2.1.2 Coding $2,700.00 1.2.2.1 Design Review $500.00 1.2.2.2 Coding $3,300.00 1.2.3.1 Design Review $300.00 1.2.3.2 Coding $2,000.00 1.2.4.1 Design Review $300.00 1.2.4.2 Coding $2,000.00 1.3.1.1 Specifications Testing $200.00 1.3.1.2 Integration Testing $400.00 1.3.2.1 Specification Testing $400.00 1.3.2.2 Integration Testing $400.00 1.3.4.1 Specification Testing $200.00 1.3.4.2 Integration Testing $400.00 1.4.1.1 Specification Testing $1,000.00 1.4.1.2 Flow Diagram $1,000.00 1.4.1.3 User Manual TBD 1.4.2.1 Methodology $400.00 1.4.2.2 Materials $1,000.00 1.4.2.3 Help Menu $500.00 1.4.3.1 Formation $800.00 1.4.3.2 Support Team $400.00 1.4.3.3 Potential Users $2,000.00 1.4.3.4 Final Users $400.00 1.5.1.1 Provider Selection $200.00 1.5.1.2 Hardware Purchase $4,000.00 1.5.2.1 Provider Selection $200.00 1.5.2.2 Software & Hosting Purchase $6,000.00 1.5.3.1 Implementation Plan $800.00 1.5.3.2 Recruitment $400.00 1.5.3.3 Implementation Component $200.00 1.5.4.1 Software/Hardware Integration $400.00 1.5.4.2 Application Install $400.00 1.5.4.3 System Transfer to End User $1,500.00 2. Complete the chart given below. Calculate a total contingency reserve equal to 10% of the estimated cost of the deliverables (design, development, and implementation). Quality assurance and training, estimate 3% of the estimate as the contingency reserve. 3. Fill in the following chart. Calculate the management reserve as 5% of the total cost estimate for the project budget. 4. Fill in the following chart with the corresponding costs. Calculate for the total project budget
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started