Cost($) Rate ($/hr) Time (hrs) Research: Jimmy time 1 2 Dad's time 25 2 Materials: Lumber 200 Hardware 45 Power equip rental 65 Jimmys time
Cost($) Rate ($/hr) Time (hrs) |
Research: Jimmy time 1 2 Dad's time 25 2 |
Materials: Lumber 200 Hardware 45 Power equip rental 65 Jimmys time to aquire materials 1 3 Dad's time to acuire materials 15 3 |
Construction: Jimmy's time 1 8 Dad's time 20 8 |
Inspection: Mom's time 10 0.5 |
Following are elements of a WBS for a project to build a bunk bed. Using the information supplied here, create a WBS and carry out a bottom-up cost estimate.