Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: Standard Hours or Quantity Standard
Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed:
Standard Hours or Quantity | Standard Price or Rate | |
Direct materials | 3.0 pounds | 0.75 per pound |
Direct labour | 0.4 hours | 12.00 per hour |
Variable manufacturing overhead | 0.4 hours | 9.00 per hour |
During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of direct labour hours. The following events occurred during March: 8,600 pounds of sand were purchased at a cost of 7,310. 7,200 pounds of sand were used for core tests. 840 actual direct labour hours were worked at a cost of 8,610. Actual variable manufacturing overhead incurred was 3,200. The labour rate variance for March is:Multiple Choice
-
1,470 unfavourable.
-
1,470 favourable.
-
4,578 unfavourable.
-
4,578 favourable.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started