Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Indirect Materials Other
Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Indirect Materials Other Overhead Indirect Labor $370,000 Production Activity Grinding Polishing Product modification Providing power System calibration $225,000 550,000 $255,000 590,000 Additional information on the drivers for its production activities follows. Grinding and Polishing Product modification Providing power System calibration 14,000 machine hours 1,500 engineering hours 17,000 direct labor hours 900 batches Number of units Machine hours Engineering hours Batches Direct labor hours Job 3175 150 units 500 MH eng. 34 hours 35 batches 410 DLH Job 4286 1,875 units 5,000 MH 36 eng. hours 105 batches 3,690 DLH 1. Classify each activity as unit level, batch level, product level, or facility level. Grinding Polishing Product modification Providing power System calibration Required: 2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing costs into a single cost pool. Determine overhead costs to assign to the above jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned" to the nearest whole dollar.) Job 3175 Job 4286 Activity driver Overhead incurred assigned Activity Overhead Cost Activity Drivers Activity Rate Overhead assigned Activity driver incurred Grinding & Polishing Machine hours Product modification Engineering hrs. Providing power Direct labor hrs. System calibration batches Required: 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) Product DL hours Plantwide OH rate Total Overhead Cost Units Produced OH Cost per unit Job 3175 Job 4286
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started