Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Craftmore Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Production Activity Indirect Labor

Craftmore Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records.

Production Activity Indirect Labor Indirect Materials Other Overhead
Grinding $ 360,000
Polishing $ 215,000
Product modification 550,000
Providing power $ 255,000
System calibration 440,000

Additional information on the drivers for its production activities follows. DRIVERS

Grinding and Polishing 11,000 machine hours
Product modification 1,900 engineering hours
Providing power 21,000 direct labor hours
System calibration 1,300 batches

Required: 1. Compute the activity overhead rates using ABC. Form cost pools as appropriate.

Job 3175 ----------Activity Rate---------- Activity Driver Incurred Overhead Assigned
Grinding and Polishing
Product modification
Providing power
System calibration
Job 4286 ----------Activity Rate---------- Activity Driver Incurred Overhead Assigned
Grinding and Polishing
Product modification
Providing power
System calibration
Job 3175 Job 4286
Number of units 170 units 2,125 units
Machine hours 450 MH 4,500 MH
Engineering hours 27 eng. hours 22 eng. hours
Batches 30 batches 90 batches
Direct labor hours 460 DLH 4,140 DLH

2. Determine overhead costs to assign to the following jobs using ABC. (Do not round your intermediate calculations. Round your activity rate answers to 2 decimal places and other answers to nearest whole dollar amount.)

3. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 4286? (Round average overhead cost per unit to 2 decimal places.)

Job 3175 Job 4286
Number of units 170 units 2,125 units
Machine hours 450 MH 4,500 MH
Engineering hours 27 eng. hours 22 eng. hours
Batches 30 batches 90 batches
Direct labor hours 460 DLH 4,140 DLH

4. If the company used a plantwide overhead rate based on direct labor hours, what would be the overhead cost for each unit of Job 3175? Of Job 4286? (Round OH cost per unit to 2 decimal places.)

Job 3175 Job 4286
Number of units 170 units 2,125 units
Machine hours 450 MH 4,500 MH
Engineering hours 27 eng. hours 22 eng. hours
Batches 30 batches 90 batches
Direct labor hours 460 DLH 4,140 DLH

5. Compare the overhead costs per unit computed in requirements 3 and 4 for each job. Which method more accurately assigns overhead costs? (Round your answers to 2 decimal places.)

Job 3175 Job 4286
Number of units 170 units 2,125 units
Machine hours 450 MH 4,500 MH
Engineering hours 27 eng. hours 22 eng. hours
Batches 30 batches 90 batches
Direct labor hours 460 DLH 4,140 DLH

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

IATF 16949 2016 Plus ISO 9001 2015 Audit Guide And Checklist With ISO 9001 Customer Specific Core Tools And CQI Requirments

Authors: Patrick Ambrose, Systemsthinking .works

2nd Edition

154703355X, 978-1547033553

More Books

Students also viewed these Accounting questions