create a Work Breakdown Structure of a school project. Create the WBS in words not tree-like Include at least three levels. Include at least 15
create a Work Breakdown Structure of a school project.
- Create the WBS in words not tree-like
- Include at least three levels.
- Include at least 15 work packages.
- Contains 100% of the scope of the project.